Power
Although Hot Rails will not specify any power infrastructure, we will include some cost estimates of it here all the same. AECOM13 AECOM13’s estimates are detailed in the table below; the total cost of $5.2 billion comes to an average of $2.975m/km. [table] Element,Cost,Unit,Frequency Modify existing substation,$5m,Each,As needed New transmission…