Track costs

Although the track cost estimates in AECOM13 are reasonable, they are based on just one real-world example from Germany, and additionally are specifically for very high speed track (400km/h). The Hot Rails strategy only requires 200 to 250km/h quality track, for which the required tolerances and material strength is not so …